Dynamic Engineering PMC2PCI Especificações Página 24

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 128
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 23
HARDWARE INSTALLATION
2-2 PP 41x/03x
2.2 Unpacking and Inspection
Immediately after the board is delivered to the user’s premises the user should carry out a thorough
inspection of the package for any damage caused by negligent handling in transit.
CAUTION: If the packaging is badly damaged or water-stained the user must insist on
the carrier’s agent being present when the board is unpacked.
Once unpacked, the board should be inspected carefully for physical damage, loose components
etc. In the event of the board arriving at the customer’s premises in an obviously damaged
condition Concurrent Technologies or its authorized agent should be notified immediately.
Vista de página 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 127 128

Comentários a estes Manuais

Sem comentários